Tram line 6 in Graz
Tram line 6 runs between Smart City/Peter-Tunner-Gasse/tim in northwestern Graz and St. Peter in the southeast, serving 23 stops.
The line connects the Smart City development and Helmut List Halle with Graz Hauptbahnhof, the historic city centre, Jakominiplatz, Graz University of Technology and the residential district of St. Peter.
The extension from Schulzentrum St. Peter to the present eastern terminus opened on 9 November 2007, while the extension to Smart City opened on 26 November 2021. Line 6 operates on weekdays until approximately 19:30. During evenings and at weekends, the same termini are served by Line 16, which takes the Neutorlinie through the city centre.
Starting at Smart City/Peter-Tunner-Gasse/tim, line 6 runs south through Nikolaus-Harnoncourt-Park and Dreierschützengasse/Helmut-List-Halle. It continues through Starhemberggasse and Daungasse/Hauptbahnhof before joining the established western tram corridor at Köflacher Gasse/PVA and reaching the partly underground stop beneath the forecourt of Graz Hauptbahnhof.
From Hauptbahnhof, the line continues through Esperantoplatz/Arbeiterkammer/tim and along Annenstraße through Roseggerhaus and Südtiroler Platz/Kunsthaus. It crosses the River Mur, passes through the historic centre via Hauptplatz/Congress and reaches Jakominiplatz, the principal interchange on the Graz public transport network.
Line 6 then runs east through Dietrichsteinplatz, Neue Technik, Münzgrabenkirche and Moserhofgasse. After St. Peter Friedhof and Schulzentrum St. Peter, it continues through Plüddemanngasse, Eisteichgasse, Breitenweg and Prof.-Franz-Spath-Ring before terminating at the turning loop in St. Peter.
Below is a stop-by-stop description of the route of tram line 6 in Graz. Times shown are an estimate of the time taken to travel between each stop.
The following icons are shown next to the name of the stop to indicate interchanges with other routes
- Interchange for other tram routes.
- Interchange on to bus routes.
- Interchange on to train routes.
- Interchange on to metro/subway/underground routes.
- Interchange on to boat routes.
- Interchange for airport.
- Interchange for a cable-car/urban cable-car service.
- Interchange for a lift.
Smart City/Peter-Tunner-Gasse/tim is a tram terminus serving the Smart City Graz development and its tim mobility hub. The stop opened on 26 November 2021 with the extension through the district.
The stop is also served by tram line 16 and provides connections to bus services.
Nikolaus-Harnoncourt-Park serves the adjoining park named after Austrian conductor Nikolaus Harnoncourt. The park includes lawns, seating areas and a water feature.
The stop is also served by tram line 16 and provides connections to bus services.
Dreierschützengasse/Helmut-List-Halle serves the Helmut List Halle, a concert and events venue created through the conversion of a former industrial building and opened in 2003.
The stop is also served by tram line 16 and provides connections to bus services.
Starhemberggasse serves the redeveloped residential area between the Helmut List Halle and Graz Hauptbahnhof. The stop opened in 2021 as part of the Smart City tramway extension.
The stop is also served by tram line 16 and provides connections to bus services.
Daungasse/Hauptbahnhof is located on the northern approach to Graz Hauptbahnhof. The stop opened in 2021 as part of the Smart City tramway extension.
The stop is also served by tram line 16 and provides connections to rail services.
Hauptbahnhof is a partly underground tram stop beneath the forecourt of Graz’s principal railway station. It provides interchange with national, regional and S-Bahn trains and local and regional bus services.
The stop is also served by tram lines 1, 4, 7, 16 and 17 and provides connections to bus and rail services.
Roseggerhaus is an intermediate stop on Annenstraße. It takes its name from a nearby building constructed in 1913 and named in honour of Styrian writer Peter Rosegger. The stop also provides access to the Hospital of the Elisabethinen.
The stop is also served by tram lines 1, 4, 7, 16 and 17 and provides connections to bus services.
Neue Technik serves the Neue Technik campus of Graz University of Technology, one of the university’s three principal campus locations.
The stop is also served by tram line 16 and provides connections to bus services.
Münzgrabenkirche serves the nearby Catholic parish church, built between 1952 and 1960 to designs by Austrian architect Georg Lippert. It replaced an earlier church destroyed during the Second World War.
The stop is also served by tram line 16 and provides connections to bus services.
Moserhofgasse is located at the junction of Münzgrabenstraße and Moserhofgasse, serving the surrounding residential area in the Jakomini district.
The stop is also served by tram line 16 and provides connections to bus services.
St. Peter Friedhof serves the extensive St. Peter cemetery complex, including the Catholic city cemetery established in the late 18th century and the adjoining Protestant cemetery opened in 1856.
The stop is also served by tram line 16 and provides connections to bus services.
Schulzentrum St. Peter serves a cluster of educational institutions and is a major interchange with city and regional buses. Its tram turning loop remains from its time as the terminus, before the route was extended to St. Peter in 2007.
The stop is also served by tram line 16 and provides connections to bus services.
Plüddemanngasse is named after Martin Plüddemann, a German composer and music educator best known for his ballads and songs.
The stop is also served by tram line 16 and provides connections to bus services.
Eisteichgasse serves the St. Peter farmers’ market and the nearby Terrassenhaussiedlung, a protected 1970s housing complex regarded as an important example of participatory and Brutalist architecture.
The stop is also served by tram line 16.
Breitenweg serves a residential area of St. Peter near the small Breitenweg plague chapel, rebuilt in 1930 on the site of an older wayside chapel.
The stop is also served by tram line 16.
Prof.-Franz-Spath-Ring is named after Graz-born surgeon Franz Spath, who led the University of Graz’s surgical clinic and performed Austria’s first successful heart operation using a heart-lung machine in 1962.
The stop is also served by tram line 16.
St. Peter is a tram terminus opened on 9 November 2007, when the route was extended from Schulzentrum St. Peter. Trams turn using a loop integrated into the surrounding residential development, with connections available to local bus services.
The stop is also served by tram line 16 and provides connections to bus services.